Client
Penang Inc.
Budget
$0.8 mio
Location
Riverside, AL
Construction Time
14 months
Contractor
Liquid Fabrics Inc.
Scope
Research numerous construction materials
Nature of Factory:Construction of warehouse and development of yard.
Value of work:Rs. 1357.00 lakhs (Excluding the cost of Cement and Steel),
Actual Value of work Executed:Rs. 1716.39 Lakhs (Excluding the cost of Cement and Steel)
Time period:12 months
Nature of job civil:Construction of warehouse complex along with Ancillary building like administrative block and development of yard.
Salient Features :Total 3 Sheds, 2 sheds are 206m x 35 m and one shed is 125m x 35m.
Vacuum dewatering flooring (VDF) done inside the shed areas i.e 18,795 sqm.
Ordinary concrete flooring in the remaining 12 Acrs.
i.e around 25,000 sqm.
Total Structural Steel fabricated for the 3 sheds is 1450 M.T.
We have completed the 186 nos of piles in One month itself.
Consultants:Mr. Venkata Reddy, M/s. Silparupa