| Nature of Factory: | Defense Ordinance Factory |
| Value of work: | Rs. 106 lakhs |
| Time period: | 18 months |
| Nature of job: | Strengthening of the structural steel work of the factory – 800 MT of strusses at 24 M height. |
| Salient features: | The job was carried out without disruption of the production with zero damage to highly costly and sophisticated equipment and manpower. |
| The entire job was carried out only during nights when the production was off. | |
| The entire project was completed with in the stipulated time only. |