Client
Fuison Corp. Inc.
Budget
$0.8 mio
Location
Richmond, AZ
Construction Time
18 months
Contractor
Perpetum Technica Inc.
Scope
Analyzing numerous construction materials
Nature of Factory:Defense Ordinance Factory
Value of work:Rs. 106 lakhs
Time period:18 months
Nature of job:Strengthening of the structural steel work of the factory – 800 MT of strusses at 24 M height.
Salient features:The job was carried out without disruption of the production with zero damage to highly costly and sophisticated equipment and manpower.
The entire job was carried out only during nights when the production was off.
The entire project was completed with in the stipulated time only.