Featured Projects
Projects are our top priority and the foundation.
,
• Visakhapatnam, Andhra Pradesh
Anglian Infrastructure development private limited
Construction of 6000 Sq.mts godowns, Two floors 1000 Sq.mtrs. Administrative office building and effluent treatment plant during 1992-1993
Client
Penang Inc.Budget
$0.8 mioLocation
Phoenix, AZConstruction Time
14 monthsContractor
Mill Fabrics Inc.Scope
Analyzing numerous construction materialsIndian Potash Limited
Construction of main factory building and godowns of 10,500 sq mtrs heavy machinery foundation.
Client
Penang Inc.Budget
$0.8 mioLocation
Riverside, ALConstruction Time
14 monthsContractor
Liquid Fabrics Inc.Scope
Research numerous construction materials• Visakhapatnam, Andhra Pradesh
Srivalli Shipping and Transport Private Limited
While improving understudy access to materials has consistently been a spark for our work.
Client
Willems Constr. Inc.Budget
$0.3 mioLocation
Nashville, TNConstruction Time
8 monthsContractor
Richmod Services Inc.Scope
Rranslate the project program into physical.SHAR, Sriharikota, Andhra Pradesh
The type of treatment selected depends on the size of particles present in the wastewater. In practice, treatment efficiency also depends on particle size.
Client
Faust IndustriesBudget
$5.9 mioLocation
Green Port, FLConstruction Time
28 monthsContractor
Systems Construction IncAwards
Energy Distribution Award.SHAR, Technical Building
Job involved excavation over 20 acres, 200 foundations, road embankments, lined canal of 1000 meters and compound wall around 20 acres land during 1997-98.
Client
Space Industries LLCBudget
$2.8 mioLocation
Austin, TXConstruction Time
18 monthsContractor
Era Semiconductor Inc.Scope
Spaceship constructionMilitary Engineering Services
Strengthening of the structural steel work of the factory – 800 MT of strusses at 24 M height.
Client
Fuison Corp. Inc.Budget
$0.8 mioLocation
Richmond, AZConstruction Time
18 monthsContractor
Perpetum Technica Inc.Scope
Analyzing numerous construction materials• Visakhapatnam, Andhra Pradesh
Gateway East India Private Limited
Timely completion of job of volume 7.33 crores with in the schedule time work which has been monitored by Singapore consultants.
Client
Penang Inc.Budget
$0.8 mioLocation
Riverside, ALConstruction Time
14 monthsContractor
Liquid Fabrics Inc.Scope
Research and delivery of lightweight material• Visakhapatnam, Andhra Pradesh
Sankar foundation, Eye Hospital
Timely completion of job of volume 7.33 crores with in the schedule time work which has been monitored by Singapore consultants.